Lights out

Pictured is the Tesla Powerpack installed at the Elmsdale substation, another aspect of the pilot project which was not deployed during Hurricane Dorian because of downed power lines.

Hurricane Dorian struck down a great many power lines this past September, including the one which electrified my house, saddling me with the indignity of a small generator while some neighbours had to abandon their homes altogether, seeking warmth and water where the grid hadn’t yet failed. This was the case for hundreds of thousands…

This content is for PR Monthly members only.
Register
Already a member? Log in here
Zack Metcalfe